top of page
Mechanical Renovation
Hover for details.  Click/tap for full image.

Before
Old steel tanks were removed

After
Final installation of new filters

Assembly
New tanks required reassembled on site due to size

Assembly
Partially assembled

Assembly
Reassembled filters

Assembly
Fully assembled and painted

Plumbing
The filter location was changed, and a large portion of the plumbing was redone

Turbidity
Turbidity meters were installed to track filtration performance

Surge Tank
A sectional surge tank was assembled on site as well

Before
Old heat exchanger system

After
New heat exchanger system
ECY Reno: Gallery
bottom of page